top of page

Materials and Components

Below is a list of materials and components that were installed at 110 Prince Ave.

IMG-2068.jpg
  • New hot water tank

  • New energy efficient  gas furnace and duct work

  • New central air 

  • New kitchen cabinets and granite counter tops

  • New stainless steel appliances

  • New vanities and counters

  • New engineered hardwood flooring

  • New windows and doors

  • New drywall and paint

  • New stair cases and handrails

  • Upgraded electrical

  • New electrical fixture

  • New plumbing piping

  • New plumbing fixtures

  • Upgraded insulation

  • New hardy plank exterior

  • New fir exterior Trim

  • New rooftop patio

  • Newer roof shingles

  • New soffit and trim

  • New base board and casing

  • New framed and insulated basement with separate entrance

  • New master bedroom built-in cabinetry & bookselves

unnamed.jpg
  • facebook
  • twitter
  • youtube
bottom of page